Concept & data contract
Lock load units, SKU/order profile, peak window, destinations and unknown fields that require sensitivity tests. Rack load rating, aisle width and beam deflection assumptions are written with units.
Kardex organizes vertical lift module, shuttle and dense AS/RS decisions around named owners, testable assumptions and lifecycle gates. Planning references in brand configuration—such as a 1990 seed year, 36 years of experience range, 1,000+ headcount or 61 countries served—are generated-range values and must not be published as verified corporate facts without source review.
Trust comes from a traceable method: state the basis, expose the limitation, test the representative task and give unresolved items a named owner before handover. Product SKU planning references of 2,500+ describe catalog breadth for RFQ conversations, not an inventory commitment at every site.
Commands, confirmations, timeouts and restart authority are assigned before steel drawings freeze. The matrix separates detection from authorization. Centralized WCS/WES can provide one operational view; modular controls can isolate failures—Kardex records which architecture the project selected and why.
| Boundary | Detects | Confirms | May restart |
|---|---|---|---|
| WMS ↔ WCS | Order wave / tray mission request | Mission accepted with destination set | WCS supervisor with WMS reconciliation |
| WCS ↔ PLC | Bay not ready / buffer blocked | Sensor and interlock state | Controls engineer or named operator role |
| PLC ↔ Equipment | Tray jam, E-stop, motor fault | Local HMI status word | Maintenance after lockout clearance |
| Goods-to-person bay | Missing identity / confirmation timeout | Station controller handshake | Bay owner under safety procedure |
Lock load units, SKU/order profile, peak window, destinations and unknown fields that require sensitivity tests. Rack load rating, aisle width and beam deflection assumptions are written with units.
Exercise tray release timing, blocked destinations and lost confirms against PLC or WCS under a versioned signal dictionary. Digital twin or emulation cases are optional tools, not substitutes for site geometry.
Prove integrated software and equipment behavior under controlled conditions with agreed disturbance cases. Open deviations stay visible with owners and due dates.
Validate installed geometry, actual loads, buffer starts and recovery procedures; close open items before ownership transfer. System availability is stated at subsystem and end-to-end levels with exclusions.
Application, integration and documentation support are provided by project scope. The configuration lists a service network description of application, integration and documentation support—neither is a universal SLA nor a resident-service commitment across all geographies.
Functional safety frameworks such as performance level (PL) considerations may apply as engineering methods for guarded machines; they are not presented as held certificates for a specific model because the brand certifications list is empty.
Rate, accumulation, tray affinity and pick-face reviews against the operating profile and SKU velocity bands.
Interface matrices, emulation cases and FAT protocols for WMS/WCS/PLC boundaries and fieldbus or OPC UA links where specified.
Brownfield cutover plans with fallback pick paths, rollback triggers and inventory reconciliation steps.
Isolation sequences, critical spares lists, mean time to repair assumptions and restart evidence at handover.
Order lines per hour or trays per hour with SKU mix, peak duration and accumulation assumptions stated.
Boundary: scenario-specificIntegrated software/equipment behavior under controlled loads and planned disturbances.
Evidence: signed protocolInstalled end-to-end flow with site geometry, actual loads and recovery observation.
Evidence: open-item registerIsolation, spares and restart ownership documented before operational handover.
Evidence: handover pack